Fullstack IntelligenceDiscuss Your ProjectGet in Touch

Documented deployment / China

Shaba River Bridge event follow-up

X-7 recorded an event at Shaba River Bridge. On-site follow-up identified accidental contact during construction.

Shaba River Bridge · Yaxi Expressway · Sichuan, China

Equipment
X-7 and monitoring platform
Record
Mobile event follow-up
Finding
Accidental contact during site construction
Yaxi Expressway · Shaba River Bridge field evidence
Original site photograph reproduced in the project event record.
Yaxi Expressway · Shaba River Bridge monitoring record
Original mobile event record documenting on-site follow-up.

Documented follow-up

From an event to a site explanation.

  1. Detect

    Record abnormal measurements at the monitored point.

  2. Review

    Review readings and device details on mobile.

  3. Check on site

    Identify construction contact and add a site photograph.

  4. Record the conclusion

    Keep the finding and handling status with the event.

Project evidence & scope

The mobile record contains measurements, a site photograph, a handling entry and processed status. It documents construction contact, not a predicted bridge failure.

Source: Fullstack Intelligence’s X-7 project brochure. Original photographs and platform records retain their Chinese annotations.

View full original project record

Planning a similar deployment?

Share your asset type, country and monitoring requirements.

Discuss Your Project
Next case: Dongdagang Bridge