Documented deployment / China
Shaba River Bridge event follow-up
X-7 recorded an event at Shaba River Bridge. On-site follow-up identified accidental contact during construction.
Shaba River Bridge · Yaxi Expressway · Sichuan, China
- Equipment
- X-7 and monitoring platform
- Record
- Mobile event follow-up
- Finding
- Accidental contact during site construction


Documented follow-up
From an event to a site explanation.
Detect
Record abnormal measurements at the monitored point.
Review
Review readings and device details on mobile.
Check on site
Identify construction contact and add a site photograph.
Record the conclusion
Keep the finding and handling status with the event.
Project evidence & scope
The mobile record contains measurements, a site photograph, a handling entry and processed status. It documents construction contact, not a predicted bridge failure.
Source: Fullstack Intelligence’s X-7 project brochure. Original photographs and platform records retain their Chinese annotations.
View full original project recordPlanning a similar deployment?
Share your asset type, country and monitoring requirements.