What data can engineers review after a trigger?

Know what sits behind the notification.

The X-7 application brochure describes configurable monitoring data from five seconds before and five seconds after a threshold event. The saved Shaba River X-7 record shows acceleration fields, tilt fields, a photograph and a staff finding. Confirm the delivered window, sample spacing and processing for the proposed configuration; the saved screenshot is not a full waveform export.

Sources: X-7 application brochure, page 2, Shaba River Bridge saved mobile record.

How much data is recorded around the trigger?

The manufacturer’s X-7 brochure gives five seconds before and five seconds after the event as a customisable configuration. Read the original statement on page 2. Treat this as a configuration to verify for the proposed X-7 hardware and software, rather than evidence of a particular delivered waveform.

For X-8, request a representative export for the proposed event configuration. The X-7 brochure alone does not establish the X-8 event window. Agree the trigger threshold, units, pre/post duration, sample spacing, timestamp definition and treatment of overlapping or interrupted events.

What does a real X-7 event record contain?

Shaba River Bridge: fields displayed in the saved X-7 record
Displayed fieldValue
X acceleration1776 mg
Y acceleration−168 mg
Z acceleration7224 mg
Tilt angle0°
Tilt direction0°
Staff handling entry“现场施工,误碰” — accidental device contact during construction

These are source-screen values, including the displayed units. They are not a time-series export, a peak particle velocity measurement, or proof of structural damage. The staff finding followed a site check. Original saved record.

Original Chinese Shaba River X-7 event record showing three acceleration values, tilt fields, photograph and handling entry
Original project screenshot. Open it to compare the transcription with the source.

The event and handling entries in the source have different dates. This guide does not use them to calculate a response-time claim. The Shaba River case guide walks through the saved evidence.

What should be in a representative export?

Agree the event record before integration
Ask forWhy it matters
Device, asset point and configuration versionConnects the readings to the installed device and settings.
Event timestamp, time zone and trigger ruleAllows the team to align the event with an inspection or separate video.
Sample times, units and pre/post durationShows what the window actually contains.
Processing, missing samples and truncation rulesExplains what was changed or could be absent.
Photograph, reviewer finding and handling statusKeeps the human conclusion with the event, where the workflow supports it.

Sampling, upload and notification are separate stages. A local sampling frequency does not establish the upload frequency, a continuous cloud record or the time at which a person receives an alert. Request those definitions and check them in the evaluation.

Can I use this as an API example?

The download below is a transcription of the visible Shaba fields with source and scope columns. It helps a team discuss the evidence. It does not define field names, an API payload or a guaranteed export format for X-7 or X-8.

Download the source-record transcription (CSV)

For an integration, use the data handover checklist and request an actual sample from the proposed configuration.

Sources and scope

  1. X-7 application brochure, page 2Manufacturer brochure, English edition supplied for this review; publication date not stated. The full page is reproduced without retouching.
  2. Shaba River Bridge saved mobile recordX-7 project material, China. The guide transcribes the displayed values; it does not reconstruct a time series.
  3. Recorded platform views and data routesCaptured from the working China platform on 9 November 2026. Identifiers are omitted; views do not define an export schema.

Prepared from manufacturer materials and the project records named above. Engineering acceptance remains specific to the proposed installation.