Fullstack IntelligenceDiscuss your siteDiscuss your site

X-7 or X-8
for your asset?

Choose the event and the record your team needs. Then compare the complete configuration.

Compare the nodes
X-7 compact monitoring node with integrated solar panel

X-7

Compact monitoring

A compact node for selected points across the asset.

Explore X-7
X-8 wireless monitoring node with solar panels and antenna

X-8

Tilt & power configuration

A larger listed battery, with 4G and LoRa.

Explore X-8

Compare X-7 and X-8

Compare the task and connection first
ConfirmX-7X-8
Starting taskCompact installation at multiple pointsA point with different tilt or power requirements
Tilt accuracyManual lists ±0.5°; confirm test conditions0.01°
Cellular4G4G
Local wirelessLoRa on X-7 ProLoRa listed for X-8

Manufacturer configurations. Accuracy, resolution, repeatability and long-term drift describe different aspects of performance. Ask for the proposed unit’s evidence.

Review power, dimensions and measurement evidence
Details to confirm before ordering
ConfirmX-7X-8
Internal batteryCapacity varies across document revisionsManual lists 10,000 mAh
Enclosure in manual110 × 38 × 38 mm130 × 69 × 45 mm
PowerSolar-assisted charging + internal batterySolar-assisted charging + internal battery
Data routeManaged, connected or raw-data scopeManaged, connected or raw-data scope

X-7: manual-listed tilt accuracy ±0.5°. X-8: tilt accuracy 0.01°. Discuss the measurement conditions, resolution, repeatability and drift required by your task.

Agree mounting, network coverage, energy balance and the applicable environmental test documents. Existing records below concern X-7 in China.

X-7 installation record · X-7 event follow-up
S1 Pro warning unit with speaker, red and blue flashing lights and LED text display

Add on-site warnings with S1 Pro.

Sound, flashing lights and LED messages.

A separate warning system for your site response. Trigger warnings from compatible monitoring nodes or by remote command. Compatible devices and trigger rules are agreed for each site.

Start with the site.

Start with the asset, the event and your current inspection process. We’ll review the node, mounting, data route and responsibilities needed for a defined evaluation.

What determines the project cost?

Ask for an itemised scope covering nodes, accessories, installation, communications, platform or data delivery, receiving-system work and support. Confirm maintenance, replacements, currency, tax and delivery terms in the quote. This site does not publish a fixed node or subscription price.

Prepare an evaluation and quote scope