Fullstack IntelligenceDiscuss your siteDiscuss your site

Dongdagang Bridge monitoring

X-7 monitoring, external video and on-site warnings support collision-event review at a bridge over a navigation channel.

Dongdagang Bridge · Changtai Expressway · Jiangsu, China

Dongdagang Bridge field evidence
  1. X-7 installation points
Original project photographs: selected guardrail and bridge-pier installation locations, with device close-ups. The photographs do not establish the total project device count.
Waterway setting
Changtai Expressway bridge over a navigable channel in Jiangsu, China, with a wharf upstream
Monitoring need
Record changes relevant to suspected vessel impacts and support event review
Sensing equipment
X-7 nodes at selected guardrail and bridge-pier locations
Review equipment
Monitoring platform and separate external video
On-site warnings
Separate audio-visual warning equipment
Evidence basis
Company project narrative, installation photographs and platform screenshots
Dongdagang Bridge monitoring record
  1. Device locations
  2. Device status
Monitoring platform showing device locations and status.

Four roles in one deployment.

  1. Sensing at selected points

    X-7 nodes provide local sensing at selected bridge points; the project addresses vessel-impact risk around the navigation opening.

  2. Platform visibility

    View the bridge map, device status and events.

  3. Visual review

    Use external video to review the scene.

  4. On-site warnings

    Separate audio-visual modules provide on-site warnings. The original record does not identify these modules as S1 Pro.

Read the installation photograph.

Original Dongdagang installation photograph with English notes outside the image explaining guardrail locations, pier locations and separate system roles
English reading notes added outside the original photograph. Source: X-7 application brochure, page 24.

Project evidence & scope

The company project record describes a bridge over a navigable waterway near a wharf, monitored for collision-related events. Installation photographs show selected guardrail and bridge-pier locations; the platform screenshot shows mapped devices and status. X-7 sensing, video review and on-site warning equipment have separate roles. This is evidence of a configured deployment, not a measured accident-prevention rate, confirmed strike count or end-to-end alarm latency.

Source: Fullstack Intelligence’s Chinese X-7 application brochure, page 24. This English account is a summary of company project materials; the original photographs and platform records retain their Chinese annotations. Reviewed October 2026.

View full original project record

Discuss the task at your site.

Share the asset, country and event you want to record. Use this X-7 project as a starting point for a site-specific evaluation.

Discuss your site
Next case: Shaba River Bridge