Dongdagang Bridge monitoring
X-7 monitoring, external video and on-site warnings support collision-event review at a bridge over a navigation channel.
Dongdagang Bridge · Changtai Expressway · Jiangsu, China

- X-7 installation points
- Waterway setting
- Changtai Expressway bridge over a navigable channel in Jiangsu, China, with a wharf upstream
- Monitoring need
- Record changes relevant to suspected vessel impacts and support event review
- Sensing equipment
- X-7 nodes at selected guardrail and bridge-pier locations
- Review equipment
- Monitoring platform and separate external video
- On-site warnings
- Separate audio-visual warning equipment
- Evidence basis
- Company project narrative, installation photographs and platform screenshots

- Device locations
- Device status
Four roles in one deployment.
Sensing at selected points
X-7 nodes provide local sensing at selected bridge points; the project addresses vessel-impact risk around the navigation opening.
Platform visibility
View the bridge map, device status and events.
Visual review
Use external video to review the scene.
On-site warnings
Separate audio-visual modules provide on-site warnings. The original record does not identify these modules as S1 Pro.
Read the installation photograph.

Project evidence & scope
The company project record describes a bridge over a navigable waterway near a wharf, monitored for collision-related events. Installation photographs show selected guardrail and bridge-pier locations; the platform screenshot shows mapped devices and status. X-7 sensing, video review and on-site warning equipment have separate roles. This is evidence of a configured deployment, not a measured accident-prevention rate, confirmed strike count or end-to-end alarm latency.
Source: Fullstack Intelligence’s Chinese X-7 application brochure, page 24. This English account is a summary of company project materials; the original photographs and platform records retain their Chinese annotations. Reviewed October 2026.
View full original project recordDiscuss the task at your site.
Share the asset, country and event you want to record. Use this X-7 project as a starting point for a site-specific evaluation.