Define the task
Name the asset, event, measured quantity and the person who reviews it. Include the required accuracy, event duration and current inspection process.
Define a small technical evaluation around the inspection decision your team needs to make.
Name the asset, event, measured quantity and the person who reviews it. Include the required accuracy, event duration and current inspection process.
Review the hardware revision, mounting, safe access, network, power, data handover and local delivery responsibilities.
Keep baseline readings and a representative event record. Decide how the team will check, record and accept the evaluation.
Review the saved-event guideShare your location. We check mobile coverage or local LoRa requirements, mounting, sunlight and power for the chosen configuration.
Choose a managed, connected or raw-data scope. Confirm the required fields, receiving-side work and tests. Compare the routes
Ask for hardware, accessories, installation, communications, platform or interface work, support, maintenance and replacement terms. Confirm currency, tax basis, delivery terms and exclusions together.
Agree documentation language, commissioning, training, support hours, local responsibilities and warranty terms in the quote. Sample supply, price and installation arrangements are confirmed for the project.
Your country, asset, target event, approximate monitoring points, timing and existing software. A rough description is enough.