Record bridge events.
Support the site check.

X-series nodes record tilt, vibration and impact events at selected points. The bridge team reviews the record with available video or a site check, then keeps the finding with the event.

Explore the mounting points.

Select a marker to place the X‑8 on the edge beam or the X‑7 on the concrete parapet.

See the project records

Dongdagang Bridge

Monitoring with separate video and warning equipment

Dongdagang Bridge field evidence
  1. X-7 installation points
Original project photographs: selected guardrail and bridge-pier installation locations, with device close-ups. The photographs do not establish the total project device count.
Waterway setting
Changtai Expressway bridge over a navigable channel in Jiangsu, China, with a wharf upstream
Monitoring need
Record changes relevant to suspected vessel impacts and support event review
Sensing equipment
X-7 nodes at selected guardrail and bridge-pier locations
Review equipment
Monitoring platform and separate external video
On-site warnings
Separate audio-visual warning equipment
Evidence basis
Company project narrative, installation photographs and platform screenshots
Dongdagang Bridge monitoring record
  1. Device locations
  2. Device status
Monitoring platform showing device locations and status.

Project evidence & scope

The company project record describes a bridge over a navigable waterway near a wharf, monitored for collision-related events. Installation photographs show selected guardrail and bridge-pier locations; the platform screenshot shows mapped devices and status. X-7 sensing, video review and on-site warning equipment have separate roles. This is evidence of a configured deployment, not a measured accident-prevention rate, confirmed strike count or end-to-end alarm latency.

Source: Fullstack Intelligence’s Chinese X-7 application brochure, page 24. This English account is a summary of company project materials; the original photographs and platform records retain their Chinese annotations. Reviewed October 2026.

View full original project record

Shaba River Bridge

An event record followed by a site check

Yaxi Expressway · Shaba River Bridge field evidence
  1. Site photograph
Original site photograph reproduced in the project event record.
Asset and location
Shaba River Bridge, Yaxi Expressway, Sichuan, China
Monitoring point
X-7 device at an upper bridge-pier location, as described in the company narrative
Event route
Abnormal data, then staff mobile notification, then site check
Site finding
Accidental contact with X-7 during construction
Handling
Photograph taken, record archived and alarm closed by staff
Evidence basis
Company narrative, mobile event record and site photograph
Yaxi Expressway · Shaba River Bridge monitoring record
  1. Handling status
  2. Recorded measurements
Original Chinese mobile record: readings, a site photograph, a staff handling entry and processed status. See the scope note below before interpreting the timestamps.

Project evidence & scope

This record documents a sensor event followed by staff investigation and closure. The cause was established through a site check, not automatic damage diagnosis. It does not demonstrate a bridge failure or a confirmed vessel impact.

The narrative and screenshot contain different event and handling timestamps. A precise event time and response duration are not stated here because their relationship has not been clarified.

Source: Fullstack Intelligence’s Chinese X-7 application brochure, page 25. This English account is a summary of company project materials; the original screenshot retains its Chinese annotations. Reviewed October 2026.

View full original project record

From a change to a checked record.

  1. Sense a change

    X-7 or X-8 nodes record local tilt, vibration and impact. Monitoring points and event settings are agreed for the bridge.

  2. Record and notify

    The configured platform and notification route bring an event to the responsible team. Separate S1 Pro equipment can provide on-site warnings.

  3. Check the cause

    Staff review available external video or arrange a site check. A sensor event alone does not establish a vessel strike or structural damage.

  4. Keep the conclusion

    Record the finding, supporting photographs and handling status. The Shaba River Bridge record documents this human follow-up.

Monitoring supports event review; it does not replace bridge inspection or an engineer’s assessment. Cameras and warning equipment are separate from the sensing nodes.

Before you start

Does monitoring replace a bridge inspection?

No. The devices record changes at installed points; an engineer assesses their significance and any need for inspection.

How would our team hear about an event?

Events reach the configured platform and notification route for your team to review. External video and on-site warnings are separate options.

Where would sensors be installed?

We assess the structure, event of concern, safe access, mounting, power and connectivity for each site.

Can events reach our existing software?

Fullstack can discuss delivering agreed readings or processed events to the software your team uses. The fields, format, security and testing need project agreement; raw-data delivery requires your own software capability. See data access routes

Can we test one bridge first?

Define one bridge, the target event and the acceptance criteria. Confirm equipment supply, installation, notifications and reviewer responsibilities for the evaluation. Plan an evaluation

Which monitoring node should we evaluate?

X-7 is the compact option for multi-point coverage; X-8 can be assessed for a different tilt or power requirement. Compare the required measurement quality, communication and power conditions before selecting a node. Compare the models

Is there experience with a bridge over a navigable waterway?

The Dongdagang Bridge project in Jiangsu, China combines X-7 sensing with external video and separate audio-visual warning equipment for collision-related event review. It is a China deployment record, not an Australian reference site.

What should an Australian bridge owner verify first?

Ask for the proposed node model and measurement test conditions, mounting and safe-access arrangements, local network compatibility, power assumptions, data handling and integration responsibilities. Agree who reviews events, what support is included and how a small pilot will be accepted. Confirm any project-required compliance documentation before procurement.

For an initial evaluation, send bridge and mounting-point photographs, the events of concern, likely monitoring locations and available communications. Plan an evaluation · Company and project background

Discuss your bridge site.

Share your bridge location, the events you want to monitor and an approximate number of monitoring points. Our team will help assess product fit, outline a pilot setup and clarify what is needed for a project quote.